MPO Breakout & Harness Cable

MPO 8F OS2 Type B Low-Loss to LC Duplex Breakout Cable

Specify an MPO 8F OS2 Type B low-loss to LC duplex breakout cable when the approved build requires eight single-mode fibers arranged as four LC/UPC duplex pairs. This configuration pairs an MPO/APC female end with a yellow OS2 cable. Confirm the MPO interface drawing, branch pairing and optical acceptance limits before placing an order.

MPO Breakout & Harness Cable

Specify an MPO 8F OS2 Type B low-loss to LC duplex breakout cable when the approved build requires eight single-mode fibers arranged as four LC/UPC duplex pairs. This configuration pairs an MPO/APC female end with a yellow OS2 cable. Confirm the MPO interface drawing, branch pairing and optical acceptance limits before placing an order.

Product Overview

This configuration is intended for buyers who already require Type B wiring and a low-loss MPO termination. The four duplex branches provide eight individual fiber paths; they do not divide an optical signal or change its wavelength. Each branch must reach the correct transmit and receive ports in the approved channel design.

The supplied product brief identifies an MPO-8/APC female connector. Eight active fibers alone do not establish the physical ferrule format or occupied positions. Ask for the connector drawing and fiber-position map, particularly when the equipment specifies an MPO-12 interface. Do not replace the supplied connector designation with another format without engineering approval.

Key Features

  • Eight OS2 single-mode fibers, organized as four LC/UPC duplex pairs.
  • MPO/APC female termination as specified in the supplied configuration brief.
  • Type B wiring requirement recorded as a fixed configuration attribute.
  • Low-loss MPO grade subject to an agreed maximum insertion-loss limit and test conditions.
  • Yellow jacket; length, branch dimensions and jacket selection recorded on the order drawing.
  • Branch identification tied to the project port schedule, subject to labeling confirmation.

Technical Specifications

ItemConfiguration / confirmation requirement
Product familyMPO breakout / harness cable
Active fibers8
Fiber modeOS2 single-mode, 9/125 μm; exact fiber designation: confirmation with BWNFiber
MPO endMPO-8/APC female in source brief; ferrule format, key reference and occupied positions: confirmation with BWNFiber
LC ends4 × LC/UPC duplex; eight fiber terminations
WiringType B specified; full MPO-position-to-LC map: confirmation with BWNFiber
Jacket colorYellow in source brief
MPO insertion lossSource target ≤0.35 dB; test wavelength, reference method and guaranteed scope: confirmation with BWNFiber
Typical MPO insertion lossSource value ≤0.25 dB is unverified; do not use as a guaranteed acceptance limit
MPO return lossSource target ≥60 dB; applicable measurement conditions: confirmation with BWNFiber
LC insertion / return lossSKU-specific limits: confirmation with BWNFiber; MPO limits do not cover the LC end
Overall lengthSource selection 1–50 m; availability and measurement reference points: confirmation with BWNFiber
Branch lengthSource selections 30 / 45 / 60 cm; datum, tolerance and staggered layout: confirmation with BWNFiber
Jacket optionsSource lists LSZH, OFNP and OFNR; approved cable construction and applicable documentation: confirmation with BWNFiber
Diameter, bend radius, temperatureconfirmation with BWNFiber; not established by this product brief
Compliance documentsApplicable standard editions, scope and SKU evidence: confirmation with BWNFiber

Selection Guidance

Confirm four duplex pairs on the drawing

Use the following purchase-review record for this configuration. Engineering must populate the physical MPO positions from the approved connector drawing; this table does not invent a Type B pin map.

Duplex branchLC identifiers to approveMating equipment / panelRequired MPO position record
11A / 1BProject port IDBoth positions, key-view orientation and Tx/Rx path
22A / 2BProject port IDBoth positions, key-view orientation and Tx/Rx path
33A / 3BProject port IDBoth positions, key-view orientation and Tx/Rx path
44A / 4BProject port IDBoth positions, key-view orientation and Tx/Rx path

Separate connector loss from channel acceptance

Compare quotations against guaranteed limits for the same test method and wavelength. A typical MPO value cannot stand in for the maximum loss of every finished branch. Request the LC-end limits and an end-to-end acceptance requirement. Engineering should include all connections, fiber attenuation and the required margin in the channel budget, without counting a connector twice when a measured assembly value already includes it.

For channel-level design, use the existing MPO polarity channel review workflow. This product page supplies configuration inputs; it does not approve the entire link.

Applications

  • Transitioning an approved single-mode MPO connection to four LC duplex connections in a rack or panel layout.
  • Projects specifying Type B and a separately defined low-loss MPO acceptance class.
  • Candidate parallel-optics breakout connections after equipment, host breakout mode, lane mapping, pinning and link-budget verification.

DR4 or PSM4 wording alone is not a compatibility approval. The exact module and peer interfaces must support the intended lane-level connection. For example, Cisco’s QSFP112 module documentation identifies an MPO-12 APC interface for its QSFP-400G-DR4. That equipment-specific specification does not verify the connector construction or interoperability of this BWNFiber assembly.

Order Guide

Keep OS2, eight active fibers, four duplex LC/UPC branches, the specified MPO/APC female end, Type B wiring and the agreed low-loss grade on one controlled order record. A change to those attributes requires a revised configuration review.

Order fieldInformation to send
Endpoint evidenceBoth equipment model numbers or panel-interface drawings
Branch pairingApproved 1A/1B through 4A/4B labels and destination ports
LengthOverall length in metres, reference points and tolerance
FanoutEach branch length, equal/staggered layout and breakout-point position
JacketInstallation requirement and requested jacket documentation
Optical acceptanceMPO, LC and finished-path limits with method and wavelength
Commercial requirementsQuantity, destination, sample requirement and requested delivery date

The source lists 1, 1.5, 2, 3, 5, 7, 10, 15, 20, 25, 30, 40 and 50 m lengths. These are requested configuration choices, not confirmed stock. For reference, 1 m ≈ 3.28 ft, 1.5 m ≈ 4.92 ft and 2 m ≈ 6.56 ft. Metres govern the order unless the approved drawing states otherwise.

Custom length, 0.9 mm branches, staggered fanout, pulling eyes and private labels appear in the source material; availability for this assembly is confirmation with BWNFiber. A pulling-eye request also needs an approved installation load and handling method. MOQ, quotation, sample terms and delivery are subject to confirmation. The suggested source order-code pattern is not a verified production part number.

Why Source from BWNFiber

Use the quotation review to establish exactly what BWNFiber will supply: the approved build revision, four-pair branch schedule, optical acceptance criteria and agreed shipment documentation. Ask for a representative test-record format before approving a batch; availability and traceability arrangements are confirmation with BWNFiber.

For adjacent configurations, start with the MPO breakout and harness cable range. The existing MPO/MTP fanout assembly page provides wider family context. Values on that general page must be reconciled with this SKU’s approved specification.

FAQ

Need a Configuration Review or Sample?

Does eight fibers mean eight duplex branches?

No. This configuration has eight fibers arranged as four duplex pairs. Eight duplex branches would require sixteen fiber paths.

Is the MPO connector definitely a 12-position ferrule?

The source calls it MPO-8. The physical ferrule and occupied positions require the BWNFiber connector drawing; the active-fiber count does not settle that question.

What does low loss apply to on this page?

The source assigns the low-loss grade to the MPO end. Confirm separate LC-end and finished-assembly acceptance limits before using the value in a channel budget.

Can the typical loss value be my acceptance limit?

No. Use the agreed maximum limit under the defined test conditions. The source typical value is unverified and is not a guarantee for each fiber path.

Does Type B guarantee my four duplex links will work?

No. The approved channel map must include branch pairing, endpoint Tx/Rx positions, intervening components and connector orientation.

Can this harness connect to every DR4 module?

Compatibility needs the exact host, optical modules and connector drawings. Do not infer it from the DR4 label or the eight-fiber count alone.

Are LC/APC connectors interchangeable with these LC/UPC ends?

No. The specified LC ends are UPC. Each mating connection must use the correct interface and polish; changing the LC polish creates a different configuration.

Can I select Type A under the same configuration?

This page defines Type B. Request a separately reviewed configuration if the project requires another mapping.

How should I specify unequal branch lengths?

Provide the breakout-point datum, each branch’s connector reference point, destination port and required tolerance on the drawing.

Does choosing LSZH establish a US plenum rating?

Do not use a jacket label as a substitute for the required installation documentation. Ask for evidence tied to the supplied cable construction and project requirement.

What test records should accompany the order?

Agree on branch IDs, build revision, test wavelength, method, per-path results and pass/fail limits. BWNFiber’s available record format and inspection scope require confirmation.

What information starts a useful quotation?

Send both endpoints, the four-pair map, length drawing, jacket requirement, optical limits, quantity and destination. Include any unresolved item so it can be reviewed before order release.

Send your endpoint references and four-pair branch schedule to request a configuration review. Include the requested maximum loss, length, jacket, quantity and delivery destination. Ask for confirmation of the build drawing and test-document scope before approving a sample or production order.

Related Products

Related Products

Explore additional fiber optic products related to this item and suitable for similar network deployment needs.