Hero
Connect an OM4 MPO-16 distribution point to sixteen individual LC simplex terminations. Specify the branch destinations, connector interfaces and routing dimensions before requesting a quote.
Product Overview
This MPO-16 OM4 to 16 LC simplex breakout cable is specified for installations that need each of sixteen fibers to terminate separately. The supplied configuration lists one female MPO-16 connector, sixteen LC/UPC simplex connectors and a violet OM4 jacket. It is intended for an approved Base-16 distribution layout with individually identified LC destinations.
Sixteen simplex connectors describe sixteen separate fiber terminations. They do not establish sixteen duplex links, a transceiver breakout mode or a transmission speed. Where the system uses paired transmit and receive fibers, the equipment documentation and approved position map determine the pairs.
The supplied file identifies the MPO end as PC. Keep that detail on hold until BWNFiber confirms the connector part number and mating-interface drawing. Do not substitute APC or assume that all multimode MPO-16 interfaces use the same polish. The MTP-16 connector reference documents a distinct connector and keying family; it does not establish the brand or compatibility of this BWNFiber assembly.
Key Features
- One defined 16-fiber configuration for individual LC termination.
- OM4 multimode fiber and violet jacket specified in the supplied material.
- Separate LC/UPC simplex ends for a project-specific branch identification schedule.
- A configuration request that records every MPO position and LC destination.
- Overall length and branch lengths specified separately on the assembly drawing.
These are the proposed configuration attributes. Final construction, availability and performance are confirmation with BWNFiber.
Technical Specifications
| Field | Supplied configuration / release requirement |
|---|---|
| Assembly | One MPO-16 to 16 × LC simplex ends; confirm approved BOM |
| Fiber count | 16 fibers; confirm continuity of all positions |
| Fiber category | OM4 multimode, 50/125 μm — confirmation with BWNFiber |
| MPO gender | Female / unpinned in source; verify the mating interface |
| MPO polish | PC in source; connector part and end-face drawing required — confirmation with BWNFiber |
| LC interface | 16 × LC/UPC simplex in source — confirmation with BWNFiber |
| Jacket color | Violet in source; confirm against the supplied photograph and BOM |
| Trunk diameter | 3.0 mm in source — confirmation with BWNFiber |
| Overall length | Requested range 1–50 m; available builds and measurement datum require confirmation |
| Branch length | Source lists 30, 45 and 60 cm; approve individual branch lengths on drawing |
| Jacket choices | Source lists LSZH, OFNP and OFNR; exact construction and applicable documentation required |
| Optical performance | Approved maximum insertion loss and return loss, wavelength and test method required |
| Environment | Temperature, bend radius and tensile limits not supplied; confirmation with BWNFiber |
| Compliance | No certification or compliance claim released from this draft |
The source lists MPO insertion loss ≤0.60 dB, typical ≤0.35 dB and LC insertion loss ≤0.20 dB. These are unverified attachment values, not accepted limits for purchase or publication. Ask for the approved test specification identifying whether each value applies to a connector pair, a termination or the complete assembly. A typical value must not replace a guaranteed acceptance maximum.
Selection Guidance
Confirm the termination format
| Requirement | Selection consequence |
|---|---|
| Sixteen individual LC simplex destinations | Review this configuration and the numbered branch schedule |
| Eight paired LC duplex connections | Select a documented duplex assembly; do not silently treat this SKU as a duplex version |
| MPO-12 distribution interface | Select a matching interface or a separately engineered transition |
| MPO-to-MPO redistribution | Use the MPO conversion cable range |
| Enclosed front-panel presentation | Compare the breakout and cassette approaches before selecting the assembly |
Approve the position map
Record the viewing direction, key orientation and pinning at the MPO interface. Assign each input position to its LC branch ID and destination port. Account for all sixteen positions once; mark any unused project destination explicitly. A Type A, B or C label alone is insufficient to approve the build.
For channel-level design, continue to the MPO polarity and channel design guide. The product drawing must remain specific to this assembly, including its revision and direction of view.
Measure the route and branches
Provide the path from the MPO connection to the breakout point and from that point to each LC destination. Specify the connector reference planes used for overall length, the longest and shortest branches, permitted tolerances and whether branches should be staggered. Confirm bend and strain limits from the approved cable construction. Do not add an arbitrary slack allowance without checking the cabinet route.
Check the application separately
A fiber count does not prove SR8, 400G or 800G compatibility. Supply the exact equipment and optical-module part numbers if the assembly connects to active optics. The optical interface, wavelength, supported breakout mode and complete transmit/receive map must all match. A passive harness routes fibers; it does not convert a transmission protocol.
Applications
Individual LC panel termination
Use this configuration as a candidate where an approved MPO-16 OM4 distribution path must terminate on separately identified LC panel positions. The branch schedule should follow panel labels and the service team’s identification convention.
Integration and acceptance setups
For a rack integration or test setup that requires separate access to each fiber, specify the branch lengths and inspection access around the actual fixture. Suitability for a particular test method or equipment port requires engineering confirmation; the assembly is not a loopback device.
Distributor configuration requests
Use one controlled BOM and drawing revision when collecting project requirements or repeat-order requests. Record the optical build separately from packaging and label artwork so a revised carton label does not conceal a changed fiber map.
Order Guide
Use the following request fields in place of a repeated list of assumed stocked SKUs.
| RFQ field | What to provide |
|---|---|
| Reference | Attachment reference 4; final BWNFiber order code to be assigned |
| Endpoints | MPO mating part / panel reference and sixteen LC destination IDs |
| Connector build | MPO-16 pinning, polish and keying; LC/UPC simplex construction |
| Fiber | OM4 and required jacket color |
| Mapping | Controlled 16-position-to-branch schedule with drawing revision |
| Length | Overall datum, branch dimensions, tolerances and route constraints |
| Jacket | Requested fire/environment classification and destination project requirements |
| Acceptance | Maximum loss limits, test scope, wavelengths and report fields |
| Commercial | Quantity, sample need, destination, required delivery date and packaging |
The attachment lists these nominal overall lengths. They are request values, not a statement of inventory. Metres control; feet below are approximate, not alternative manufacturing tolerances.
| Metres | Approximate feet |
|---|---|
| 1 | 3.28 |
| 1.5 | 4.92 |
| 2 | 6.56 |
| 3 | 9.84 |
| 5 | 16.40 |
| 7 | 22.97 |
| 10 | 32.81 |
| 15 | 49.21 |
| 20 | 65.62 |
| 25 | 82.02 |
| 30 | 98.43 |
| 40 | 131.23 |
| 50 | 164.04 |
Do not release the proposed order-code pattern from the attachment as a catalog identifier until BWNFiber approves its syntax and option combinations. MOQ, production lead time, sample availability and pricing are confirmation with BWNFiber.
Customization and Quality Review
Requested construction options
The source mentions alternate branch lengths, 0.9 mm legs, staggered fanout, pulling eyes and OEM labels. Submit these as requests for feasibility review. Available combinations, mechanical protection and assembly dimensions are confirmation with BWNFiber. Jacket labels alone do not prove the product meets a project’s installation requirements.
Acceptance documents to request
Request a signed specification, connector BOM, dimensioned drawing, full continuity map and an example of the proposed optical test report. Confirm the report identifies the assembly and revision, fiber or branch ID, test wavelength, method, reference arrangement, limits and measured results. Agree the inspection and documentation scope before ordering a sample or production lot.
The attachment names IEC 61300-3-4 as a test-method reference and several interface or performance standards. Listing a standard is not evidence of compliance. BWNFiber must confirm the applicable parts and editions, test conditions and supporting records. Neither RoHS evidence nor a fire-rating document is included in the supplied material.
Related Products
- MPO breakout and harness cable range — compare assembly families before specifying a build.
- MPO/MTP fan-out product range — broader connector and fiber configurations.
- MPO trunk cables — backbone assemblies when both ends remain MPO.
