Hero
This MPO 12F OS2 to LC duplex breakout cable brings twelve single-mode fibers from one MPO-12/APC female connector to six LC/UPC duplex pairs. The supplied configuration uses a yellow jacket. Specify the six destination ports, pair mapping and branch reach before requesting a quotation.
Product Overview
Use this configuration when a twelve-fiber single-mode distribution path needs six paired LC terminations. The cable provides a physical fanout; it does not convert an optical signal or establish a supported transceiver breakout mode. Confirm the interfaces and complete channel map against the equipment and panel documentation.
The supplied product describes twelve OS2 9/125 μm fibers, an APC female MPO end and UPC LC ends. confirmation with BWNFiber:the approved connector parts, fiber specification and assembly drawing. APC at the MPO end and UPC at the LC ends describe different interfaces on the cable, not permission to mate APC and UPC end faces together.
Compare other termination formats in the MPO breakout and harness range. This product page covers the six-duplex-pair build; a twelve-simplex build has separately managed endpoints and needs a separate configuration decision.
Key Features
- Twelve fibers arranged as six LC duplex pairs in the supplied build.
- MPO-12/APC female interface and LC/UPC branch interfaces.
- OS2 single-mode fiber with a yellow jacket specified in the attachment.
- Ordered mapping to be fixed on a numbered assembly drawing; no field polarity-switching feature is claimed.
- Overall cable length and LC branch reach specified separately.
- Pair labels and A/B endpoint assignments to be agreed with the destination port schedule.
confirmation with BWNFiber:these source-defined attributes and available options against the current BOM. Jacket color is an identification aid, not proof of fiber grade or installation suitability.
Technical Specifications
| Item | Source configuration or approval requirement |
|---|---|
| Fiber count | 12 fibers / 6 duplex pairs |
| Fiber grade | OS2 single-mode, 9/125 μm; exact fiber specification requires approval |
| MPO end | MPO-12/APC female; verify part number, key orientation and mating interface |
| LC ends | 6 × LC/UPC duplex; verify pair arrangement and destination A/B labels |
| Color | Yellow jacket in source item 16 |
| Overall length | Source lists 1–50 m; supported lengths and tolerances: confirmation with BWNFiber |
| Branch length | Source lists 30 / 45 / 60 cm and a 30 cm default; chosen dimensions require drawing approval |
| Polarity | Source lists Type A / B / C; approve the complete twelve-position map |
| Jacket choices | Source lists LSZH / OFNP / OFNR; availability and classification evidence: confirmation with BWNFiber |
| Optical acceptance | Final insertion-loss and return-loss limits, wavelengths, reference method and scope: confirmation with BWNFiber |
| Mechanical data | Cable/leg diameter, bend radius, pulling limits and operating temperature: confirmation with BWNFiber |
| Compliance | Exact standards, editions, test reports and RoHS documentation: confirmation with BWNFiber |
The source’s numerical loss values and standards list are not approved test evidence. They are preserved in the audit ledger for quality review rather than offered here as verified performance or certification.
Selection Guidance
Check six pairs against the receiving ports
Confirm that the destination calls for six paired LC interfaces. Twelve individual LC connectors can carry the same number of fibers, but their grouping and handling differ. Do not approve the simplex alternative solely because the connector count adds up to twelve.
| Connection task | Candidate | Decision before ordering |
|---|---|---|
| Twelve OS2 fibers to six paired LC destinations | This source configuration | Approve pair assignments and connector interfaces |
| Twelve separately routed LC destinations | A twelve-simplex configuration | Check leg independence and labels; source item 17 is a candidate, not a verified live page |
| A specified eight-active-fiber module link | A module-specific assembly | Confirm occupied positions and lane map; this twelve-fiber build is not automatically equivalent |
| MPO-to-MPO patching | An MPO patch cord | Use the separate patch-cord family |
Approve a pair map, not just a polarity label
Use the following six-row schedule as an RFQ input. It intentionally leaves fiber positions blank: sequential numbering would be an unverified wiring instruction. Define the MPO viewing direction and key orientation on the drawing.
| LC duplex pair | MPO positions for LC A / LC B | Destination / Tx-Rx assignment | Required leg reach |
|---|---|---|---|
| Pair 1 | Buyer/engineering to complete | To complete | To complete |
| Pair 2 | Buyer/engineering to complete | To complete | To complete |
| Pair 3 | Buyer/engineering to complete | To complete | To complete |
| Pair 4 | Buyer/engineering to complete | To complete | To complete |
| Pair 5 | Buyer/engineering to complete | To complete | To complete |
| Pair 6 | Buyer/engineering to complete | To complete | To complete |
Record all twelve fiber positions once, confirm continuity, and check end-to-end transmit/receive routing where applicable. Type A, B or C alone should not replace the drawing. For the wider link, use the channel polarity design workflow.
Verify each mating interface
Confirm the opposite MPO connector’s pin arrangement and key orientation. Check the specified polish at each actual mating point. The attachment does not identify an MTP-branded connector, so do not substitute an MTP product claim for the generic MPO specification.
For LC, verify the receiving interface is compatible with the specified UPC ends. If the installation calls for LC/APC, request a different approved build. Do not interpret “single-mode” as a universal connector-polish rule.
Separate distribution from transceiver breakout
A twelve-fiber distribution assembly is not automatically a DR4 or PSM4 module cord. Match the exact module’s active fiber positions, lane assignments and supported host mode. Neither OS2 nor MPO-12 alone defines operating speed or reach. If the task is choosing a passive connection architecture, first review breakout cable versus cassette selection.
Applications
| Project situation | Selection condition |
|---|---|
| Single-mode distribution to six LC duplex panel positions | The upstream path and destination pair map must match |
| Equipment-room harness with paired LC routing | Each branch must reach without violating the confirmed bend limits |
| Cassette-associated cabling | Inspect the cassette’s actual external interfaces and internal map; do not assume every cassette exposes the required MPO interface |
| Distributor repeat order | Reuse an approved drawing revision and acceptance specification |
Do not use this page to claim universal Ethernet breakout compatibility, outdoor suitability or supported transmission distance.
Order Guide
RFQ sequence
- Identify the MPO-side panel or equipment and all six LC-side destinations.
- Complete the pair schedule with viewing direction, A/B labels and end-to-end routing.
- Define overall length, fanout datum, branch lengths and dimensional tolerances.
- State the installation location, destination market and required jacket documentation.
- Agree completed-assembly optical acceptance, identification and document traceability.
- Submit quantity, required delivery date and packaging requirements for a project quotation.
Source-listed lengths
| Length | Approximate feet |
|---|---|
| 1 m | 3.28 ft |
| 1.5 m | 4.92 ft |
| 2 m | 6.56 ft |
| 3 m | 9.84 ft |
| 5 m | 16.40 ft |
| 7 m | 22.97 ft |
| 10 m | 32.81 ft |
| 15 m | 49.21 ft |
| 20 m | 65.62 ft |
| 25 m | 82.02 ft |
| 30 m | 98.43 ft |
| 40 m | 131.23 ft |
| 50 m | 164.04 ft |
Meters control the requested dimensions; feet are rounded references. confirmation with BWNFiber:supported lengths, measurement datums and tolerances. A listed combination does not establish stock availability.
Customization and repeat ordering
Send nonstandard lengths, branch spacing, labels and packaging as requests for review. confirmation with BWNFiber:custom options, OEM printing, sample availability, MOQ, price and delivery schedule. Record the accepted connector parts, fiber map, jacket construction and drawing revision with the order. A source item number or proposed order code alone is insufficient for a repeat build.
Quality and Acceptance
Request the approved BOM and drawing, continuity and mapping results for all twelve fibers, connector inspection criteria and an assembly-level optical acceptance record. Agree measurement wavelength, reference method, connector grade, maximum limits and report traceability. confirmation with BWNFiber:available test records and acceptance requirements for this exact configuration.
Do not add a typical connector loss to another typical value and present the sum as a guaranteed assembly maximum. Likewise, a list of IEC or TIA documents does not establish that this cable is certified. Ask for the applicable document, edition, tested construction and scope.
At incoming inspection, compare six LC pairs, twelve mapped fibers, end-face types, labels, dimensions and the drawing revision. Inspect and clean before mating, then verify the agreed optical path. Resolve a mapping or label mismatch before connecting the harness to equipment.
Why Discuss This Build with BWNFiber?
Send one configuration record linking the six destination pairs to the twelve MPO positions. This gives BWNFiber a defined requirement to review for quotation. Ask which build options and documentation can be supplied; make the accepted drawing and test specification part of the purchase agreement.
