Hero
An MPO 12F OM4 armored to LC simplex breakout cable connects one MPO-12 interface to twelve individually terminated LC legs. The supplied configuration specifies a female PC MPO end, LC/UPC simplex ends and a violet armored trunk. Confirm the fiber map, protected section and jacket requirement before ordering.
Product Overview
This configuration is intended for buyers specifying an OM4 harness with individual LC terminations and an armored trunk. The twelve LC simplex connectors provide separate fiber endpoints; they do not by themselves define duplex port pairs, transmit/receive assignments or supported Ethernet breakout modes.
The supplied build lists twelve OM4 50/125 μm fibers, one MPO-12/PC female connector and twelve LC/UPC simplex connectors. Treat these details as a configuration for drawing review. confirmation with BWNFiber:the production BOM and connector terminology must match the approved drawing before this configuration is released.
Use the MPO breakout and harness range to compare other termination formats. For this product, the ordering decision is narrower: can the selected armor construction, LC leg arrangement and optical map satisfy the actual route and endpoint requirements?
Key Features
- One MPO-12 connection to twelve LC simplex terminations.
- OM4 multimode fiber, with violet jacket specified in the source configuration.
- Armor specified for the trunk; coverage at the fanout and individual legs must be shown on the drawing.
- Individual leg identification to be agreed against the destination port schedule.
- Fixed ordered mapping; no field polarity-switching capability is claimed.
- Overall and fanout lengths selected independently, with measurement datums agreed before production.
confirmation with BWNFiber:all construction and supply details above against the current approved product specification. Armor material, cable diameter and mechanical ratings are not established by the supplied document.
Technical Specifications
| Parameter | Source configuration / ordering requirement |
|---|---|
| Product family | MPO breakout / harness cable |
| Fiber count | 12 fibers |
| Fiber grade | OM4 multimode, 50/125 μm |
| Trunk connector | MPO-12/PC, female; confirm the exact connector part and mating interface |
| Branch connectors | 12 × LC/UPC simplex |
| Jacket color | Violet |
| Armor coverage | Armored trunk; boundary and individual leg protection require a drawing |
| Overall length | Source lists 1–50 m; availability and tolerances require confirmation |
| Fanout length | Source lists 30 / 45 / 60 cm; no default is assumed without approval |
| Mapping | Source lists Type A / B / C; use a numbered MPO-position-to-LC-leg drawing |
| Jacket | Source lists LSZH / OFNP / OFNR; approve the exact cable construction and supporting documentation |
| Optical acceptance | Insertion loss, return loss, wavelength, reference method and limits: confirmation with BWNFiber |
| Mechanical acceptance | Armor material, outside diameter, bend radius, tensile and crush limits: confirmation with BWNFiber |
| Environment | Indoor/outdoor suitability, temperature and moisture/UV protection: confirmation with BWNFiber |
| Compliance documents | Applicable standards, editions, cable classification and RoHS evidence: confirmation with BWNFiber |
The attachment’s list of IEC/TIA references does not establish certification or conformity for this assembly. Request the applicable document and its scope instead of treating a standards list as proof.
Selection Guidance
Confirm twelve individual fiber destinations
Prepare a port schedule with twelve rows. Each row should identify the MPO fiber position, the viewing direction used on the drawing, the LC leg label and its destination. Add transmit/receive pairing only where the connected equipment requires it. The labels “12 fibers,” “12 simplex” and “6 duplex pairs” describe different aspects of an assembly; they are not interchangeable ordering instructions.
Compare the physical builds
| Requirement | This proposed build | Alternative to review |
|---|---|---|
| Twelve separately routed LC endpoints | Twelve simplex LC terminations | A paired LC format if the destination requires fixed pairs |
| Armored main cable route | Trunk armor specified; limits pending | Unarmored harness if route protection already meets the project requirement |
| Eight active fibers for a specified module | Do not infer compatibility from the connector name | A module-specific harness with approved lane mapping |
| Connection between MPO panels | Branch ends are LC, not MPO | An MPO-to-MPO assembly from the appropriate range |
These alternatives are selection categories, not additional stock or certification claims.
Define the armor boundary
Specify where the armored section starts and stops, the fanout body position, the unsupported leg length and the routing space at each LC port. A protected trunk does not establish protection for exposed branches. Ask for the construction drawing, cable diameter, installation bend radius and pull method before approving a confined route.
For general construction choices, consult the armored MPO specification guide. Keep the final values on the build drawing for this assembly. Armor alone does not establish outdoor, water-blocking, rodent-resistant or direct-burial suitability.
Match the endpoints before choosing polarity
Confirm the mating connector, pin arrangement, key orientation, ferrule/end-face specification and equipment port map. Do not change PC to APC or assume a connector brand from a generic MPO description. Consult the channel polarity design workflow when the full link map is unresolved.
Applications
| Project situation | Suitability decision |
|---|---|
| Equipment room route with twelve separately identified LC fiber endpoints | Review leg reach, connector clearance and the approved fiber map |
| Indoor tray route with a specified mechanical protection requirement | Compare the required limits with the confirmed armored construction |
| Maintenance area where individual fibers need tracing | Approve durable leg labels and their relationship to the port schedule |
| Outdoor route, direct burial or repeated moving-cable service | Hold selection until construction-specific evidence establishes suitability |
This page does not assign a universal 40G or 100G application. Link operation depends on the equipment interfaces, lane assignments, fiber path and loss budget.
Order Guide
Build the RFQ in six steps
- Identify both endpoints, including module or panel references and mating connectors.
- Supply the twelve-row fiber map and LC destination labels.
- Define the main route and required armor coverage, including the fanout transition.
- Set overall length, individual leg lengths, measurement datums and tolerances.
- State the destination market, installation location and required cable classification documentation.
- Agree optical acceptance, labeling, packaging, quantity and delivery requirements before accepting the quotation.
Length selection
| Overall length listed in the source | Approximate feet |
|---|---|
| 1 m | 3.28 ft |
| 1.5 m | 4.92 ft |
| 2 m | 6.56 ft |
| 3 m | 9.84 ft |
| 5 m | 16.40 ft |
| 7 m | 22.97 ft |
| 10 m | 32.81 ft |
| 15 m | 49.21 ft |
| 20 m | 65.62 ft |
| 25 m | 82.02 ft |
| 30 m | 98.43 ft |
| 40 m | 131.23 ft |
| 50 m | 164.04 ft |
Metric dimensions control the drawing; feet are rounded references. The source’s repeated polarity/jacket/length rows have been consolidated here. A combination in a source table is not evidence of stock availability or an approved SKU.
Drawing and customization requests
Ask BWNFiber to review staggered legs, alternate fanout lengths, pulling protection, labels and packaging against the route. confirmation with BWNFiber:custom lengths, 0.9 mm legs, pulling eyes, OEM printing and the proposed order-code format in the attachment are not approved capabilities in this draft.
Do not attach a pulling accessory to connector legs without an approved load path. Request the permitted pulling arrangement and tensile limit for the actual assembly.
Quality and Acceptance
Specify the acceptance evidence before ordering: the approved BOM and drawing revision, continuity and mapping records for all twelve fibers, connector inspection criteria, insertion-loss results at the agreed wavelengths and return-loss requirements where applicable. Ask for traceability between the assembly label and its test record. confirmation with BWNFiber:which records BWNFiber supplies, their limits, test methods and delivery format.
Armor does not establish an insertion-loss value. Bend, stress, routing and assembly quality can affect optical performance; evaluate the completed cable under agreed conditions. Do not reuse acceptance values from a different connector grade or from the general harness family page.
For incoming inspection, compare the received connector count, labels, measured dimensions and drawing revision before connecting the cable. Inspect and clean the optical interfaces using the appropriate procedure, then verify the required mapping and link acceptance. Record any mismatch against the purchase specification rather than accepting a color match as proof of compliance.
Why Discuss This Build with BWNFiber?
A useful quotation should resolve this assembly’s twelve endpoints, armor boundary and acceptance criteria in one configuration record. Send the proposed build and ask BWNFiber to confirm supported options, documentation, price, MOQ and lead time for your quantity. No fixed delivery promise, production capacity or certification is asserted here.
